Project Overview

The facility will be designed to have a maximum forming capacity of 4000 metric tonnes per day. Oxbow will design environmental controls to ensure the plant meets all Alberta regulations and standards.

If approved, the Project would be:

  • Located about 15 kilometres southeast of the Village of Anzac on Highway 881.
  • Provincial land lease approximately 25 hectares in size.
  • The Project is expected to employ over 50 people during the 1 year construction period and create 24 jobs to operate the facility over the 30+ year lifetime of the facility.
  • Oxbow will invest approximately $60 Million CAD into the development of the local community during the planning, construction, and operation of the Project.